Demei flexible soft film ceiling project construction process construction key details:
1 , Construction preparation:
, Before the soft film ceiling enters the site, ensure that the site is electrified and that there is no construction waste on the site.
The bottom treatment of the soft film ceiling must meet the ceiling installation conditions, such as the installation of the keel frame, etc., must be clean.
All lights and lamps must be installed according to the size required by us, and the lamp stands must be arranged and the circuits must be well arranged and ensure that all lamp circuits are powered and bright. If any lamps are found to be defective or not bright before installing the soft film, please notify us. Adjust and replace in time. The interior of the hidden light should be painted white to achieve better results.
Air conditioning, fire piping, etc. must be arranged and installed in advance and debugged without problems. The air outlets, sprinkler heads, smoke detectors, etc. have been installed and should meet our requirements.
2. Construction technology and construction points
, process flow
Install fixed support rrr fixed installation of aluminum alloy keel rrr install soft film rrr clean soft film ceiling
, construction key points
Fix a circle of support keels (can be wooden squares or square steel pipes) around the horizontal position where the soft film ceiling needs to be installed. Note: Some places with relatively large areas require installation in blocks to achieve good results. This requires adding a wooden strip in the middle. This is handled based on the actual situation.
After all the required wooden strips are fixed, the aluminum alloy keel of the soft film ceiling is then fixed and installed on the bottom surface of the supporting keel.
After all the aluminum alloy keels for installing the soft membrane ceiling are fixed, install the soft membrane. First, open the soft film and use a special heating air cannon to fully heat it evenly. Then use a special inserting knife to tighten the soft film and insert it onto the aluminum alloy keel. Finally, trim the excess soft film around it completely.
After installation, clean the soft film ceiling with a clean towel.
3. Acceptance standards
The welding seam must be flat and smooth, and the keel curve must be natural, smooth and smooth.
The corners with other equipment and wall corners must be firm, flat and smooth, and the connections must be flat and dense.
The soft film ceiling is clean and undamaged.