Engineering consultation
Demei soft film ceiling construction drawing node diagram production in soft film ceiling construction This is the most important step. Only by completing the construction drawing node diagram can we ensure the soft film ceiling installation details and make the final actual effect consistent with the ideal effect. The following are the detailed production methods and steps of the node diagram of the Demei soft film ceiling construction drawing:
First, Demei Soft Film Ceiling determines the installation horizontal height position of the soft film ceiling according to the design requirements of the drawings. Special attention is paid to the four A circle of * supporting keels (can be wooden squares or square steel pipes) is fixed around it. Some places have relatively large areas and special circumstances require installation in blocks to achieve the best visual effect. Of course, the specific construction conditions will vary depending on the actual situation. deal with..
Secondly, after the above steps are completed, a professional model of soft-film ceiling aluminum alloy keel is fixed and installed on the bottom surface supporting the Demei soft-film ceiling keel. The specific installation method,
Once again, after all the aluminum alloy keels of the Demei soft-film ceiling are installed and fixed, the specific construction steps of the Demei soft-film ceiling can be carried out.
Finally, the construction drawings and node diagrams of Demei's soft-film ceiling must be consistent with the dimensions of the construction site. The actual situation must also be taken into consideration when doing so and cannot be out of touch.
At present, the quality of soft film ceiling materials is uneven, and the soft film ceiling keels are different for each soft film manufacturer. As a result, the final soft film ceiling construction technology cannot meet the soft film ceiling renderings designed by the designer. .
So, as the industry's top soft-film ceiling material manufacturer and first-class soft-film ceiling construction technology, how can Demei soft film ceiling solve these problems?
First of all, Demei soft film ceilings use the best raw materials from the production source, and then use unique top-notch fine processing technology to create finished products. Demei soft film ceiling keel sizes are divided into many different models and specifications. Each size corresponds to different application places and unique shapes.
On the basis of ensuring the highest quality, Demei Soft Film Ceiling maximizes the effect of the designer's soft film ceiling renderings. Among them, safe installation measures and professional technicians as well as special equipment and tools for professional soft film ceiling installation must be very good.
Demei soft film ceiling construction technology and installation process are all carried out using the latest soft film ceiling process installation technology independently developed by Demei Ceiling, which is unique in the industry.
The engineering project cooperation process is roughly divided into the following steps:
Project negotiation. Design/technical support
Signing the contract
Deposit deposit
Site measurement
Membrane material production
Delivery of final payment
Construction and installation
Product acceptance
Maintenance services. The actual operating procedures for specific individual projects are carried out in accordance with the signed contracts.
The first preparatory work in the installation process of Demei soft film ceiling is:
Before the construction of Demei soft film ceiling, the project site needs to be powered on and the indoor garbage must be free of obstacles.
The basic treatment of the suspended ceiling meets the requirements of Demei soft film ceiling. The bottom treatment meets the installation conditions of Demei ceiling.
3
The air conditioners and fire piping at the engineering site must be arranged and installed in advance, and there will be no problems in debugging and testing. The air vents, sprinkler heads, smoke detectors, etc. have been confirmed to be installed and their normal use meets the construction requirements.
How to install Zhejiang UV soft film ceiling, Zhejiang spray-painted film ceiling